Home/Job List/QA/QC Manager / Engineer – Data Center Construction

QA/QC Manager / Engineer – Data Center Construction

Mepa2z Llp

India
Full-Time
Posted 18 days ago

Job Description & Responsibilities

Title: QA/QC Engineer / QA/QC Manager

Project: Data Center Project

Location: Noida, Uttar Pradesh

Qualification: B.E./B.Tech in Civil Engineering

Experience

  • 8-12 years of QA/QC experience in data center project and construction projects.
  • Proven experience in Data Center, Industrial, Warehouse, Commercial Building, or Large Infrastructure Projects.

Preferred Candidate Profile

  • Candidates from Tamil Nadu will be preferred.
  • Must have relevant Data Center project experience.
  • Should be currently working in or around Noida/NCR and available for site-based project execution.
  • Strong experience in both Structural Steel/PEB and RCC/Concrete quality control is mandatory.
  • Strong experience in both Structural Steel/PEB and RCC/Concrete quality control is mandatory.

Role Overview

We are seeking an experienced QA/QC Engineer / QA/QC Manager to lead and manage all quality assurance and quality control activities for a large-scale Data Center Project in Noida involving PEB structures, structural steel works, composite steel-concrete structures, RCC/concrete works, foundations, and associated civil works.

The candidate will be responsible for establishing, implementing, and maintaining the project QA/QC system to ensure compliance with approved drawings, specifications, method statements, Inspection & Test Plans (ITPs), applicable standards, and client/consultant requirements.

Key Responsibilities

  • Quality Assurance:
  • Prepare and implement Project Quality Plans (PQP), Inspection & Test Plans (ITPs), quality procedures, checklists, and method statements.
  • Review AFC drawings, specifications, BOQ, material specifications, and project quality requirements.
  • Establish inspection procedures for PEB, structural steel, composite structures, RCC, and civil works.
  • Coordinate with client, consultant, contractors, subcontractors, design teams, and third-party inspection agencies.
  • Ensure all materials and construction activities comply with approved specifications and applicable standards.
  • Maintain complete QA/QC documentation, inspection records, test reports, MIRs, WIRs, NCRs, and quality dossiers.
  • PEB & Structural Steel Quality Control:
  • Inspect incoming PEB and structural steel materials including plates, sections, bolts, welding consumables, and accessories.
  • Verify Mill Test Certificates (MTCs), material grades, heat numbers, and traceability records.
  • Monitor fabrication quality including:
  • Cutting and profiling
  • Plate preparation
  • Welding
  • Dimensional control
  • Camber and alignment
  • Surface preparation
  • Painting and coating
  • Review and monitor WPS, PQR, and welder qualification records.
  • Coordinate and review NDT activities such as UT, MPI, and DPT.
  • Inspect high-strength bolted connections, torqueing, and installation records.
  • Monitor erection activities including alignment, plumbness, levels, bracing, stability, and connection details.
  • Verify member identification and traceability from fabrication through erection.
  • Inspect roofing, cladding, flashings, gutters, and associated PEB accessories.
  • Composite Structure Quality Control:
  • Inspect composite beams, deck sheets, shear connectors/studs, and associated structural steel components.
  • Verify deck profile, thickness, fixing arrangements, and end laps.
  • Inspect shear stud welding quality, spacing, positioning, and testing.
  • Verify reinforcement placement over metal decking.
  • Check temporary supports and shoring before concrete placement.
  • Monitor concrete pouring, slab thickness, levels, curing, and finishing.
  • Verify openings, embedded items, sleeves, and MEP coordination prior to concrete placement.
  • RCC / Concrete Quality Control:
  • Inspect reinforcement for:
  • Grade and diameter
  • Bar bending schedules
  • Spacing and positioning
  • Lap lengths
  • Development lengths
  • Anchorage
  • Concrete cover
  • Chairs and spacers
  • Inspect formwork for dimensions, stability, line, level, plumbness, and cleanliness.
  • Conduct pre-pour inspections and obtain necessary approvals.
  • Monitor concrete batching, transportation, placing, vibration, finishing, and curing.
  • Verify concrete grade, slump, temperature, and cube sampling requirements.
  • Coordinate laboratory testing and compressive strength evaluations.
  • Inspect foundations, pedestals, columns, beams, slabs, and other RCC elements.
  • Verify construction joints, expansion joints, water stops, and embedded items.
  • Monitor repairs of honeycombing, cracks, and other defects as per approved procedures.
  • Material Inspection & Testing:
  • Prepare and submit Material Inspection Requests (MIRs).
  • Verify all materials against approved material submittals.
  • Maintain material traceability from receipt through installation.
  • Control and segregate non-conforming materials.
  • Coordinate third-party laboratory testing and inspections.
  • Inspection & Documentation Control:

Maintain and control records for

  • MIR – Material Inspection Requests
  • WIR – Work Inspection Requests
  • RFI – Requests for Inspection / Information
  • Inspection & Test Plans (ITPs)
  • Method Statements
  • Concrete Pour Cards
  • Slump Test Reports
  • Cube Test Reports
  • Rebar Inspection Reports
  • Welding Inspection Reports
  • NDT Reports
  • Bolt Torque Reports
  • Coating / DFT Reports
  • Survey & Alignment Reports
  • PEB Erection Inspection Records
  • NCR/CAR Records
  • Final Quality Dossiers
  • NCR Management & Corrective Actions:
  • Identify quality deviations and issue NCRs.
  • Conduct root-cause analysis for recurring issues.
  • Develop and monitor Corrective and Preventive Action (CAPA) plans.
  • Ensure timely NCR closure with supporting documentation.
  • Maintain quality observation registers and punch-point records.
  • Conduct periodic audits of subcontractors and vendors.
  • Site Coordination & Reporting:
  • Attend daily and weekly quality meetings with client, consultants, and stakeholders.
  • Coordinate with construction, engineering, planning, procurement, and subcontractor teams.
  • Ensure inspections are completed prior to commencement of subsequent activities.
  • Monitor subcontractor QA/QC performance.
  • Conduct quality awareness programs and toolbox talks.
  • Ensure latest approved drawings and revisions are available at site.
  • Support preparation of as-built drawings and final handover documentation.
  • Prepare weekly and monthly QA/QC reports.

Required Qualifications & Experience

  • B.E./B.Tech in Civil Engineering.
  • 8-12 years of QA/QC experience in construction projects.
  • Mandatory experience in Data Center Projects.
  • Strong expertise in PEB/Structural Steel and RCC/Concrete Works.
  • Experience in welding inspection, NDT coordination, material traceability, and quality documentation.
  • Exposure to industrial, warehouse, commercial, or large infrastructure projects is preferred.
  • Experience handling client and consultant inspections.
  • Exposure to third-party inspections and testing agencies.
  • Candidates currently working in Noida/NCR will be preferred.
  • Candidates from Tamil Nadu are encouraged to apply.

Preferred Certifications

  • ISO 9001
  • CSWIP / AWS
  • Welding Inspector Certification
  • NDT Level II

Required Skills

AWS

Job Details

Employment TypeFull-Time
Work ModeOn-Site
Experience8 – 12 years
Positions1

Posted by

N/A

Posted on:

21 Sept 2026

About Mepa2z Llp

More open roles

Browse all jobs →